Svenska Kraftnät is Sweden's national TSO — it does not approve building connections. The regional DSO (Ellevio, E.ON, or Vattenfall Eldistribution) is the body notified when a new battery connects to the local distribution network. HNordic manages this notification.
Swedish property owners evaluating a battery storage installation encounter several grid-related names — SVK, Ellevio, their electricity supplier — and are often uncertain which body is responsible for what. The distinction matters because the notification requirements, timelines, and responsibilities differ for each.
Svenska Kraftnät (SVK) is Sweden's national transmission system operator. It manages the high-voltage transmission grid (220 kV and 400 kV), maintains the national frequency balance, and procures frequency-stabilisation capacity through the balancing market — FCR-N, FCR-D, aFRR, and mFRR. SVK is the entity that pays capacity fees to battery operators (or their aggregators) for frequency-response availability.
SVK does not approve or process individual building connection changes. A commercial property owner installing a behind-the-meter battery system does not notify SVK directly — SVK's processes operate at portfolio level through aggregators, not at individual property level.
HNordic's energy SPV registers battery capacity with SVK's aggregation framework to participate in frequency-services markets. This registration is at the SPV level, aggregating the capacity of all properties in HNordic's portfolio into a single market-facing position. The individual property owner is not a party to this registration.
Sweden's distribution network is operated by regional distribution system operators. The three largest:
When a new storage asset connects to the local distribution network, the relevant regional DSO must be notified. The notification covers the battery's technical specification (capacity, power rating, connection point, protection settings), confirms compliance with DSO connection requirements (anti-islanding, earthing, protection relay coordination), and may trigger a brief assessment of local network capacity at the connection point.
HNordic manages this DSO notification as part of every Swedish installation. The process is similar in function to the G99 notification that DNOs receive for UK installations. The property owner does not contact the DSO independently.
The property's electricity supplier — Vattenfall, Fortum, Tibber, or whichever commercial entity holds the electricity supply contract — is not a regulatory or grid connection body. It is a commercial counterparty for the electricity tariff. Notification to the electricity supplier that the property now has on-site generation may be required (it may affect the net metering arrangement and export settlement), but this is separate from and secondary to the DSO connection notification.
Handled by HNordic as part of the installation:
The property owner handles (at the commercial level):
The property owner does not handle: